Knowledge Base - Home | ||
Drawing Control Software | ||
Document Control Software | ||
Document Management Software | ||
Latest Drawings | ||
Controlled Document | ||
Project Drawing Control | ||
Drawing Control Workflow | ||
Drawing Register | ||
Document Register | ||
Drawing Transmittal | ||
Drawing Revision | ||
Drawing Review | ||
Drawing Approval | ||
Superseded Drawing | ||
Electronic Transmittal | ||
Drawing Submittal | ||
Viewing and Redlining | ||
Drawing Management System | ||
Drawing Management Software | ||
Document Control | ||
Document Controller | ||
Drawing Review Workflow | ||
Drawing Approval Workflow | ||
Drawing Index | ||
Correspondence Management | ||
Project Correspondence | ||
Correspondence Workflow | ||
Mail Workflow | ||
Correspondence Tracking | ||
Correspondence Filing | ||
Drawing ApprovalDrawing approval is a fundamental aspect of any document control system. Managing the drawings via an electronic system such as QDMS facilitates a much more simple and efficient drawing approval process. The TeamBinder Document Control System can save both time and costs for project management staff, as the drawings can be reviewed and approved simultaneously from various locations. Reasons for conducting drawing reviews include:
With QDMS, drawing approvals can be conducted in series – where the drawing can only be approved by one person at a time, or in parallel – where the drawing can be reviewed by several people at the same time. Both workflows reduce delays in design reviews, thus expediting the entire design process.
|
|